Zhejiang, China
Business Type:
Manufacturer/Factory & Trading Company
Plant Area:
27742 square meters
Management System Certification:
OHSAS18001:2007, ISO9001:2015, ISO14001:2015, CWB Certificate
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workdays
OEM/ODM Service
Sample Available
Overseas Agent / Branch

Prefabricated House, Steel Building, Prefab House manufacturer / supplier in China, offering New Design Prefab Steel Frames House for Warehouse/Factory/Garage, Prefabricated Flat-Pack Container Houses with 2 Bedroom 1 Toilet, Portable Container House Design and so on.

Diamond Member Since 2009
Audited Supplier
Supplier Homepage Products Thin-walled steel frame building New Design Prefab Steel Frames House for Warehouse/Factory/Garage

New Design Prefab Steel Frames House for Warehouse/Factory/Garage

Min. Order / Reference FOB Price
150 Square Meters US $30-50/ Square Meter
Port: Ningbo, China
Production Capacity: 20000 Square Meter/ Month
Payment Terms: L/C, T/T
Material: Steel Structure
Usage: Villa, Dormitories
Certification: ISO, CE
Customized: Customized
Main Structure: Steel Structure Plus Light Steel Keel
Stairs and Handrail: Stainless Steel

You Might Also Like

Loading...

Basic Info.

Wall Panel
PU Embossed Sandwich Panel & Fiber Cement Board
Floor Deck Board
Galvanized Steel Sheet
Downspout
PVC Pipes
Roof Insulation
EPS Sandwich Board Glaze Tile
Building Area
Customer Made
Size
Customer Made
Gutter
PVC
Crane
with or Without, We Can Design as Per Required
Trademark
PTH
Transport Package
Use Intergrated Steel Rack, Flat Packing
Specification
custom made
Origin
China
HS Code
9406000090

Thin-walled Composite frame prefab house for sale


New Design Prefab Steel Frames House for Warehouse/Factory/Garage

 
Prefab House with Light Steel Structure for Classroom and Office BuildingPrefab House with Light Steel Structure for Classroom and Office Building

They are all air-tight, heat-tight, warm-keeping, water-proof and anti-corrosive.  

S/N

Item Name

Specification

1

Main Steel Frame

light gauge steel ,Q345B galvanization 275g/m2

2

Wall System

 EPS/PU/rock wool sandwich panel

 ALC panel (autoclaved lightweight concrete)

3

Roof System

Corrugated Sandwich Panel

4

Door

Steel door/sandwich panel door

5

Window

Aluminum/PVC window

6

Ceiling

Gypsum board/PVC/steel plate

7

Floor

Fiber cement board/wooden floor/PVC/ceramic tile

8

Electricity&Plumbing

Customized as clients' requests and local standard


Prefab House with Light Steel Structure for Classroom and Office Building
Prefab House with Light Steel Structure for Classroom and Office Building
Prefab House with Light Steel Structure for Classroom and Office Building

1.Contact us
Contact us by Phone 

2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.

3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.

4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.

5.Inspection
QC team will make routine inspection in each process,and provide inspection report.

6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.

7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.

8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
 
FAQ:

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers' request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff's health and safety.

 

2.What's your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

 

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

4. How to deal with quality problems?

Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

 

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of double C structure is 20 years

 

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.

Send your message to this supplier

*From:
*To:
avatar Mr. Rutang Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now