Zhejiang, China
Business Type:
Manufacturer/Factory & Trading Company
Plant Area:
27742 square meters
Management System Certification:
OHSAS18001:2007, ISO9001:2015, ISO14001:2015, CWB Certificate
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service
Overseas Agent / Branch
Distributorship Cooperation

Prefab Villa House, Prefab House, Prefabricated House manufacturer / supplier in China, offering China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore, 20FT Combined Flat Pack Container House, 2015 Prefabricated Steel Structure Warehouse/Workshop/Factory Building and so on.

Gold Member Since 2009
Audited Supplier
Supplier Homepage Products Light Steel Villa China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore

China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore

Get Latest Price
Min. Order / Reference FOB Price
80 Square Meters US $180/ Square Meter
Port: Ningbo, China
Production Capacity: 50000 Square Meters Per Year
Payment Terms: L/C, T/T, D/P
Material: Light Steel Structure + Sandwich Panel
Usage: Villa, Dormitories, Temporary Offices, Singel Department, Living Room
Certification: ISO, CE
Customized: Customized
Main Structure: Light C Type Steel Keel
Wall System: Cement Board+Glass Wool+Gypsum Board

You Might Also Like

Loading...

Basic Info

Roof: EPS Sandwich Panel+Glass Wool
False Ceiling: Gypsum Board
Floor/Foundation: PVC or Wooden
Window: Aluminum Alloy
Door: Steel Security Door
Other Fittings: Showerroom,Toilet,Kitchen,Carridor
Life Time: Prefab Home for 70 Years
Size: Custom Made Layout
Trademark: PTH
Transport Package: Flat Pack
Specification: CE BV ISO9001
Origin: Shaoxing, Zhejiang China
HS Code: 9406000090

Product Description

Part 1:Company ProfileChina Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore
Part 2:Product Description

1.Framing System Solution
Light steel keels:
Light steel keels takes composite G550 steel(AU standard) as raw material, which have characteristics of light weight, high strength. General steel using quantity about 25 to 30 kg/. 50 years lifetime corrosion resistance with galvanized AZ150 generally if there is no special anticorrosive requirement.

 
China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore

2.Three Options for You
 Style 1:Economic

China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore

Style 2:Standard
China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore

Style 3:Better Insulation
China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore

Part 3:FAQ

1. Do you provide on-site installation service?
PTH provides customers with one-stop integrated housing solution including installation and operation. We have 3 options for on-site installation according to the customer's specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.

2.What's your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

4. How to deal with quality problems?
Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

5. If there is a clear service life of your products? If have, how long?
Under conventional climate and environment, steel structure whole building 10 years, main structure 15 years, protecting system 10 years.

6. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region:   improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anticorrosive coating.


China Modular Multi-Stories Luxury Villa House for Living/Hotel/Restore

Send your message to this supplier

*From:
*To:
avatar Mr. Rutang Zhang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now